First Solar, Inc. selected PSG as Construction Manager for the construction of their new Cafeteria, Conference Center and Fitness Center which were constructed inside of their original office area (22,000sf). The $4.7mil project was completed in two phases. The first phase consisted of constructing the new cafeteria and fitness center without impacting the existing cafeteria which resided in the same space. Phase II was to renovate the existing cafeteria into their conference center. Both phases were completed in 7 months.
This project included complete demolition of the existing office areas and construction of the cafeteria, full service kitchen, new mezzanine for the fitness center and locker rooms, new conference center, and expansion of FSI’s MDF (Data Center). Numerous skylights were cut into the existing roof structure to introduce natural light into the Café Area.